University of Oregon Hayward Field
Hayward Field is a world-class track and field facility reimagined for the University of Oregon. EC was one of the first subcontractors on site, responsible for laying out and connecting power distribution for the entire complex. Underground work included electrical systems for a 100-seat auditorium, locker rooms, classrooms, offices, weight-training areas, and a rainproof indoor practice facility for year-round training. Above ground, EC delivered power, lighting, and all race-critical low-voltage systems—including data, audiovisual, and wireless communications—throughout the stadium.
LOCATION
Eugene, OR
OWNER
University of Oregon
SCOPE
Power distribution layout and connections for the entire stadium campus
Underground electrical for auditorium, training spaces, locker rooms, offices, and classrooms
Power and lighting installation for a rainproof indoor practice facility
Full electrical, lighting, and low-voltage systems for stadium operations
Data, AV, and wireless communications infrastructure
COMPLETION DATE
2021
ERT MEMBER
E-J Electric Installation Company
Labor Hours259,566
LED Light Fixtures6,000
Conduit