Mystic Lake Casino Hydronics

Mystic Lake Casino's hydronic heat system received upgrades with the help of Egan Company's Electrical Construction team. The hydronic system is called upon for heating and cooling at the facility. Egan removed legacy switchgear and installed new paralleling switchgear as well as a new multi-tier cable busway system with the existing duct bank. A new addition to the campus's Central Utility Plant included a heat trace system on the hydronic system, new 4,000 amp switchgear, new panelboards, transformers, two automatic transfer switches (ATS), and a new uninterrupted power supply (UPS). This project also entailed in-depth planning for critical cut overs, power transfers, and outages.

LOCATION
Prior Lake, MN

OWNER
SMSC Gaming Enterprise

SCOPE

  • Renovations and upgrades to casino's hydronic heat system

  • Demolition of legacy switchgear and installation of paralleling switchgear

  • New electrical for Central Utility plant, including heat trace system, automatic transfer switches, 4,000 amp switchgear, and uniterrupted power supply

  • Key planning for cutoverse, power transfers, and outages

COMPLETION DATE
2025

ERT MEMBER
Egan Company


Total Renovation Area (SF)

42,000


Project Timeline

Project was completed in four phases over more than two years


Additional Requirements

The casino and hotel maintained normal operations without interruption during the project